Location

GIWW Mile 15-20 WHL Stump Alley

Chart No.

11367

Problem

Large stumps line the north and south bank presenting a danger to vessels and barges.

Recommendation

Remove stumps to provide safe banks for the tows to stop in a meeting, restricted visibility or an emergency situation.

Status

October 1994, Corps of Engineers reports no funds for work outside the channel. Industry requests further action and study to correct a hazardous situation.

October 1997, Corps of Engineers conducted a side scan sonar survey of both sides of Stump Alley. Minimal amount of stumps and debris was found on the south side. The north side has considerable debris in some areas. Mile board signs have been installed at Miles 15, 16, 17, 18, 19, 20 and identified on side scan surveys.

August 2001, industry has not had reported problems recently. This item will be considered CLOSED as of 8/10/01.

Action Plan

This problem is beyond the Corps' O&M authority, which provides for maintenance of a 12' x 125' channel. In response to a recent request from the GICA, the Corps provided language for possible legislation to direct the Corps to clear the stumps and provide funds for this purpose.

 
Location

GIWW Mile 51 - 53 WHL

Chart No.

11355

Problem

Stumps along both banks present a hazard to barges.

Recommendation

Obtain authority and funding to remove stumps.

Status

CLOSED as of 8/10/01.

Action Plan

See discussion of previous item.

 
Location

GIWW Mile 107 WHL

Chart No.

11355

Problem

Swift currents at the GIWW crossing of Wax Lake Spillway.

Recommendation

Study improvements to provide safe crossing for tows.

Status

October 1995, the rock weir has been removed from above the GIWW crossing and the removal has increased current.

October 1997, Corps is in the process of modeling Wax Lake intersection at the Waterway Experiment Station in Vicksburg to determine what improvements are possible. CLOSED as of 8/10/01.

Action Plan

Current velocities at the Wax Lake crossover were studied as part of the Lower Atchafalaya Basin Re-evaluation study. These analyses indicated that only moderate increases in current velocity are expected over the next 50 years. The Corps has no current plans for further study or modifications to the intersection based on these results.

 
Location

GIWW Mile 133 WHL - Mile 136 WHL

Chart No.

11350

Problem

Large stumps line the north and south banks presenting danger to vessels and barges.

Recommendation

Remove stumps to provide a safe bank for tows to pull over in a meeting, restricted visibility, or emergency situation.

Status

Industry requests further action and study to correct a hazardous situation. Corps is seeking authority and funding to remove stumps. CLOSED as of 8/10/01.

Action Plan

See discussion of other stump problems.

 
Location

GIWW Mile 172 - 177 WHL Forked Island Wiggles

Chart No.

11348

Problem

Shoaling on north bank on point. Several accidents and serious groundings have occurred.

Recommendation

Conduct survey. If a 125' channel is found the problem still remains that the bend is too sharp and the point sticks out too far.

Status

Easing of bendways at the Forked Island Wiggles has been completed. CLOSED as of 8/10/01.

 
Location

GIWW Mile 174 WHL

Chart No.

11348

Problem

Shoaling on north bank.

Recommendation

Survey and dredge.

Status

CLOSED as of 8/10/01.

Action Plan

This problem was resolved as part of the recently completed Forked Island Wiggles bendway easing project.

 